Energy saving refrigeration solution supplier since 2004.                                                                                                                                                                                                                                                                                                   

Language
Large Infrastructure Projects

5 Tons Ice Block Machine for Gangmula Mountain Tunnel

The Concrete Cooling Projects Backgroup

       The Gangmula Mountain Tunnel is located in the Tibet Autonomous Region. It is one of the control projects of the entire Lalin Railway.

The tunnel is located in the seismic zone and is a national high-risk tunnel. Geothermal, rock burst, and faults are the main problems 

of the tunnel construction. The total length of the tunnel is 11660 meters, of which the single-line tunnel is 11357 meters long, the station

 tunnel is 303 meters long, and the maximum buried depth is 1800 meters.


The Project Demand

5 tons Ice Block Machine for Tunnel Cooling


application-CBFI-img

application-CBFI-img

application-CBFI-img

application-ice machine- cold room-ice crusher-CBFI-img




Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

Recommended

Send your inquiry

Send your inquiry

Choose a different language
العربية
English
Español
français
Polski
Português
русский
Türkçe
Current language:English